Skip to content
SAINT-CONSTANT · L-1B FIELD GUIDE

Should supplier assessments be repeated to create more evidence?

Sources checked:

THE DIRECT ANSWER

Do not perform unnecessary business work solely to inflate the application record. Identify existing relevant evidence and explain its connection to the employee’s knowledge.

Agree on a proportionate preparation scope

Separate supplier-testing expense from professional review, translations and current official charges. The number of assessments purchased is not a universal L-1B eligibility measure. The failure mode is manufacturing evidence: commissioning additional assessments so the file looks fuller, at real business cost, when a reviewer will read three well-documented decisions more carefully than thirty thin ones.

Start from what already exists. Ask the process owner for a list of every internal document carrying the applicant's name, choose the ones in which something was actually decided, and budget only for retrieving, translating and reviewing those. Translation is the line most often underestimated, and it should be quoted per document from a real page count rather than guessed from a folder's thickness.

Government charges belong on their own line, with the amount verified against the official source on the day it is entered rather than reused from a previous file. Hypothetical example: an employer proposes a fresh round of supplier reviews for an industrial designer's file, and an inventory of existing records shows the material was already on the shared drive.